The preparation work before starting
5, softening water equipment can run normally. The softened water should meet the standard of GB1576, the water level in the soft water box is normal, and the pump runs without failure.
The boot
2, the burner into automatic cleaning, ignition, partial load, full load operation state;
3, when rising to a certain pressure, regular sewage should be carried out once, and check the water level in the furnace.
Inspection work in operation
4, patrol pump pressure is normal, there is no abnormal sound.
Accident stop furnace
1, when it is found that the boiler body produces abnormal phenomenon and the safety control device fails, the emergency disconnect button should be pressed to stop the operation of the boiler;
3, when the power fuel problems should be taken to press the emergency disconnect button;
4, when there is harm to the boiler or personal safety phenomenon should take emergency measures to stop the furnace.
Temporary power failure precautions
3, close the boiler continuous sewage valve to prevent other boiler faults;
4, close the oxygen supply valve;
5, according to the normal order of furnace stop, check whether the boiler fuel, gas, water valves meet the requirements of furnace stop;
Matters needing attention when gas is insufficient
3, observe the burning situation at any time, the flame is normal for wheat yellow.
EBICO will attend Thailand's Premier Power Generation & Electric Exhibition...
How a bowl of Baixiang good noodles is born? About 1.8 million years ago, humans learned to cook food with purposeful control of fire. The use of fire has made unprecedented progress in human health and life, and Darwin also called cooking the most important invention of mankind after language....