Burner construction repair technology of basic requirements: improvements in the chamber of a stove or furnace when not all tuyere replacement: a wind, secondary tuyere tuyere with basically three times square plates welded together, also often is the position of the defect, trim will burn out when resection, replace, replacement should strictly pay attention to the size and a tuyere, secondary tuyere, three tuyere mouth direction, shall not change the original design and installation size Numbers and shapes.
1) The four walls of the furnace that may cause personal injury and affect the maintenance and installation of ash and coking large blocks should be completely cleaned.
2) Remove all surrounding and external insulation.
3) Purge and clean all the virtual ash in the furnace and around the burner.
1) Before the personnel enter the furnace, the person in charge of the staff or the leader of the sub-field shall measure the temperature inside the furnace. No one can enter the furnace above 40℃.
2) Scaffolds erected shall meet the working requirements of installation, measurement and maintenance of burners; To clear ash and coking in the furnace, dismantle the old burners and safety requirements of the staff during welding. At least one layer of scaffolding can ensure that the furnace center is located at the burner level and can be fixed.
Inspect the four Angle burners in the furnace. All burners to be replaced must be cleaned and removed from the site in time.
1) Measure the center of the furnace with a tape measure at the elevation around the burner in the furnace and make corresponding marks.
2) Use wiring method to draw two lines at the center point corresponding to the four corners to intersect at a point in the furnace, which is the center of the imaginary circle.
3) It is better to fix an imaginary tangential circular cylinder with radius R at the intersection and the diameter of the cylinder is about 80cm.
1) The jet line of the burner is drawn to the center of each nozzle tangential to the imaginary cylinder and tangential to the cylinder.
2) The opposite nozzle is drawn from the center of the two nozzles and passes through the center of the hypothetical tangential cylinder.
1) The center axis of the spot-welded burner must coincide with the jet line of the group.
2) The spot welding burner must be at the overall level or in line with the drawing size.
1) The interior of the replaced primary, secondary and tertiary air vents shall be smooth without concave-convex or welding defects.
2) The angles of the first, second and third air vents shall meet the requirements of ICONS.
3) The external secondary air baffle should be flexible and free from stuck death. The stuck baffle should be dealt with or replaced in time.
EBICO will attend Thailand's Premier Power Generation & Electric Exhibition...
How a bowl of Baixiang good noodles is born? About 1.8 million years ago, humans learned to cook food with purposeful control of fire. The use of fire has made unprecedented progress in human health and life, and Darwin also called cooking the most important invention of mankind after language....