Home Questions&Answers Technology Category

Installation of burner for boiler low-nitrogen burner reconstruction

Installation of burner for boiler low-nitrogen burner reconstruction
Dec 28, 2020 Category: Technology Category Page Views: 27 Author: EBICO Burner

First, the main burner was transported to 0 m of the boiler using a flat transport vehicle, and the burner was lifted to the towing chute arranged on the 39.2 m of the boiler by a 300 ton truck crane. Two 5-ton chain reels will be used to transfer the burner to the pot during the towing of the burner

 

When the upper end of the burner reaches the bottom of the pulley group, use 60.5 mm of the wire rope four as the pulley group hoisting rope, using a 10-ton winch main crane. During hoisting, two 10-ton inverted chains are dragged to the outside of the boiler during the lifting of the burner to prevent the burner from rising too fast until the burner is completely upright. Before the burner is hoisted, another 20-ton hand hoist is equipped to adjust the levelness of the main burner. No force will be put on the chain before the 20-ton burner is hoisted. After the burner is raised, make the hand hoist bear force and adjust the burner level.

 

During the hoisting process, the rooting beam, pulley block, wire rope and burner must be monitored by someone and equipped with intercom to keep the communication unobstructed. In the process of vertical lifting, due to the narrow space on the upper part of the burner, a hand hoist should be hung at the lifting lug to make the burner move as far as possible between the water cooling wall and the steel structure platform during vertical lifting. During the lifting process, the commanding personnel will direct the main winch to lift, assign special personnel to monitor each dangerous position, and set up the burner smoothly. When the burner is fully upright, it should be suspended at 100mm above the ground and checked everywhere, especially the rooting area. Lifting should be allowed only when there is no problem. The lifting process should be kept slow and smooth.

 

Remove the 5 ton chain drag after the burner is fully upright. The conductor directs the hoist to drop the hook slowly, and in the process of falling the hook, a monitor is arranged at each floor platform and coal pipeline to monitor the burner during its descent. The Angle and position of the burner can be adjusted at any time during the lifting and descending of the burner by using a rope to prevent the burner from scraping against the surrounding steel beams and pipes.

 

When the equipment rises to the installation position, 2 10-ton hand hoist and pulley blocks are used to adjust the position of the burner, so that the burner is in place. Using the internal lifting platform of the sprayer, 4 10 tons and 4 5 tons hand hoist, adjust the burner to the required position.

 

The center line of furnace is drawn out with steel wire, and the intersection point of the two steel wires is the center point of boiler. Draw the imaginary circle on the board and nail the corresponding cutting points to fix the steel wire; The horizontal pipe is used to find the plane elevation of the board (with imaginary tangential circle), so that it is consistent with the central elevation of the nozzle, and the center of the imaginary tangential circle coincides with the central point of the boiler. Hold the plank in place. Based on the vertical end face of each layer of pulverized coal nozzles of each burner, the verticality of the burner was finally rectified by using steel ruler, line drop and hand hoist. A straight line is drawn from the center point of the corresponding nozzle to the imaginary tangent point with steel wire. Adjust the burner so that the center line of the nozzle coincides with the theoretical tangent.

 

After passing the adjustment and acceptance, the burner is firmly connected with the nearby steel frame. After passing the reexamination of the dimensions, the water-cooled wall is sealed and connected with each rigid beam.

 

Burner installation

EBICO Burner answers the Installation of burner for boiler low-nitrogen burner reconstruction for you, to learn about the FAQ of EBICO Burner Technology Category. You can also learn more about other Technology Category FAQ about the EBICO Burner.
Need more information about EBICO please contact us
Need help?
Latest News
More
Sep 26, 2023

How a bowl of Baixiang good noodles is born? About 1.8 million years ago, humans learned to cook food with purposeful control of fire. The use of fire has made unprecedented progress in human health and life, and Darwin also called cooking the most important invention of mankind after language....

Sep 22, 2023

Heat delivers real deliciousness. In recent years, China's kimchi industry has grown rapidly, with a market size of more than 40 billion. With the gradual rise of the "stay-at-home economy", Chinese compound condiments and prepared dishes have become new trends in the industry....

Burner Products
Based on the experience of optimization and integration of combustion technology resources in Europe, we have achieved a safe, energy-saving and environmentally friendly burner that can be adapted to all thermal equipment.
Innovation
EBICO's attitude of pursuing excellence and continuous improvement promotes the innovation of burner products in safety, energy saving, environmental protection and intelligence.
CSR
CSR
EBICO has always established a positive relationship with the environment, economy and society in order to fulfill its responsibilities as an enterprise.
Focus on burners and equipment to lead the global thermal industry.
欧保(中国)环境工程股份有限公司版权所有 苏ICP备20014131号-1
Online
Email
Inquire