The burner to the boiler operation layer, the first turn on the burner casing and actuator is installed in the vent on the connecting flange of fastening bolts, good combination of oil gun and wear on the actuator, adjust good firing gun according to drawings and oil gun stretched out the length of the nozzle and the Angle of firing gun, bolted ticked with paint. After the fuel is put into operation, atomization test is carried out on the oil gun, and the installation of the combustion device is finished after reaching the requirements of the inspection standard.
Russian users have special requirements for the noise decibels when the burner is running smoothly, and they also have extremely strict emission standards for carbon oxides and nitrogen oxides. EBICO adapted the EC14GR burner according to its on-site working conditions, which can meet the needs of users while easily reaching the nitrogen oxide emission limit set by the local government of Belarus....