Damara island is located in the northeast corner of sribagawan, the capital of Brunei. The island is formed by sand reclamation. The soil is loose, high temperature, strong ultraviolet light, cloudy and sunny weather, and there is often heavy rain. In such a harsh environment, Hengyi Brunei PMB petrochemical project, the first overseas large-scale petrochemical project to fully implement Chinese standards, has been completed.
As “one belt, one road” project, Zhejiang Hengyi Petrochemical Co. cooperates with Brunei government, and it is also the largest overseas investment project of domestic private enterprises. The original processing capacity of the first phase project is up to 8 million tons / year, and the annual production of p-xylene and benzene is up to 1.5 million tons and 500000 tons respectively. The production capacity of the second phase project can be doubled.
EBICO burner provides EC10GGR burner for the project, which is oil-gas dual-purpose burner, and can be well adapted to the boiler and heat conduction oil furnace required by the petrochemical industry, with a burn out rate of nearly 100%. The application of the dual core control system enables it to adapt to the very bad working conditions and environment of the great Mora Island, and the extremely low nitrogen oxide emission can reduce the environmental pollution to the minimum, helping Brunei development At the same time of economic development, the local environment is well protected.
CTCI
Cases for Power Industry
Nanjing Baixiang food Co., LTD.
Cases for Food Industry
Sichuan Liji Pickles and Condiments Co., Ltd.
Cases for Food Industry